Jlg 40H Service Manual User Manual Page 87

  • Download
  • Add to my manuals
  • Print
  • Page
    / 152
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 86
SECTION 2 - PROCEDURES
3120240 – JLG Lift – 2-67
15. Using a slide hammer, remove seal 2 from the small
end of hub 7. Discard the seal.
16. Remove bearing cone 4 from spindle/brake 1.
17. Using a soft punch and hammer, remove bearing
cup 5 from the deep end of hub 7.
NOTE: Be very careful not to strike the counterbore of the
hub where the cup is located when using the punch.
18. Using a soft punch and hammer, remove bearing
cup 3 from the shallow end of hub 7.
NOTE: This cup can be reach by putting the punch into the
small access hole in the bottom of the hub’s deep
end.
WHEN REBUILDING TORQUE HUB, REMOVE AND REPLACE ALL
O-RINGS AND RETAINING RINGS.
Cleaning and Inspection.
1. Thoroughly clean all parts in an approved cleaning
solvent.
2. Inspect bearing cups and cones for damage, pitting,
corrosion, or excessive wear. If necessary, replace
bearings as a complete set ensuring that they
remain covered until use.
3. Inspect bearing mounting surfaces on spindle, hub,
input shaft and carrier. Replace components as nec-
essary.
4. Inspect all geared components for chipped or bro-
ken teeth and for excessive or uneven wear pat-
terns.
5. Inspect carrier for damage, especially in anti-roll pin
and planet shaft hole areas.
6. Inspect all planet shafts for scoring or other dam-
age.
7. Inspect all threaded components for damage includ-
ing stretching, thread deformation, or twisting.
8. Inspect seal mounting area in hub for burrs or sharp
edges. Dress applicable surfaces or replace compo-
nents as necessary.
9. Inspect cover for cracks or other damage, and o-
ring sealing area for burrs or sharp edges. Dress
applicable surfaces or replace cover as necessary.
Page view 86
1 2 ... 82 83 84 85 86 87 88 89 90 91 92 ... 151 152

Comments to this Manuals

No comments