SECTION 2 - PROCEDURES
3120240 – JLG Lift – 2-19
Installation.
1. Using suitable lifting equipment, position assembled
boom on turntable so that boom pivot holes in both
boom and turntable are aligned.
2. Insert boom pivot pin, ensuring that locating slots in
pin are aligned with setscrew locating holes in pin
bushings.
3. If necessary, gently tap pin into position with a soft
headed mallet. Secure pin with setscrews.
4. Connect all wiring to ground control box.
5. Using all applicable safety precautions, operate lift-
ing equipment in order to position boom lift cylinder
so that holes in cylinder rod end and boom structure
are aligned. Insert lift cylinder pin.
6. If necessary, gently tap pin into position with a soft
headed mallet, ensuring that pin plate holes are
aligned with attach holes in boom structure. Install
pin attaching bolts, washers and lockwashers.
7. Shut down machine systems.
8. Connect hydraulic lines running along side of boom.
9. Using all applicable safety precautions, operate
machine systems and raise and extend boom fully,
noting the performance of the extension cycle. If
chattering is apparent, extend chain system requires
adjustment.
10. Retract and lower boom, noting performance of
retraction cycle. If chattering is apparent, retract
chain system requires adjustment.
11. Shut down machine systems.
12. Adjust extend and retract chain systems as required
and secure adjustment recounts.
13. As necessary, lubricate all points requiring lubrica-
tion.
2.12 TILT ALARM SWITCH.
NOTE: There are two methods of adjustment, a manual
adjustment and an adjustment using a voltmeter.
PERFORM TILT ALARM SWITCH LEVELING PROCEDURE A MINI-
MUM OF EVERY SIX MONTHS TO ENSURE PROPER OPERATION
AND ADJUSTMENT OF SWITCH.
Manual Adjustment.
1. Park the machine on a flat, level surface. Ensure
machine is level and tires are filled to rated pressure.
NOTE: Ensure switch mounting bracket is level and securely
attached.
2. Level the base of the indicator by tightening the
three flange nuts through approximately one half of
its spring travel. DO NOT ADJUST THE “X” NUT
DURING THE REMAINDER OF THE PROCEDURE.
3. With the electrical connections complete, slowly
tighten one of theY” nuts until the circuit is closed
and the light on the Platform Control Console illumi-
nates.
4. Slowly back off the nut, counting the number of
turns, until the circuit is again closed and the light
again illuminates.
5. Divide the number of turns determined in step d. in
half. Tighten the nut this many turns. The line deter-
mined by this nut and the “X” nut is now parallel to
the ground.
6. Repeat steps 3. through 5. for the remaining “Y” nut.
The switch is now level.
7. Individually push down on one corner at a time;
there should be enough travel to cause the switch to
trip. If the switch does not trip in all three tests, the
flange nuts have been tightened too far. Loosen the
“X” nut and repeat steps 3. through 7.
Voltmeter Adjustment.
1. Park machine on a flat, level surface. Ensure
machine is level and tires are filled to rated pressure.
2. If engine is not running, turn ignition switch to ON.
3. Connect black lead of voltmeter to ground and red
lead to yellow wire protruding from pot on bottom of
sensor.
4. Adjust leveling nuts to obtain the highest possible
voltage reading.
5. Check Voltage at trip point in all four directions. If
voltage reading is not symmetrical, repeat step (4)
above.
2.13 HORIZONTAL HIGH SPEED CUTOUT
SWITCH ADJUSTMENT PROCEDURE.
Adjust switch to trip when boom reaches 0 degrees +0
degrees /-3 degrees.