Jlg M400 Operator Manual User Manual Page 29

  • Download
  • Add to my manuals
  • Print
  • Page
    / 118
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 28
SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
3121215 – JLG Lift – 2-9
General
Begin the “Walk-Around Inspection” at Item 1, as noted on
the diagram. Continue to the right (counterclockwise
viewed from top) checking each item in sequence for the
conditions listed in the “Walk-Around Inspection Checklist”.
TO AVOID POSSIBLE INJURY BE SURE MACHINE POWER IS OFF
DURING "WALK-AROUND INSPECTION".
DO NOT OVERLOOK VISUAL INSPECTION OF CHASSIS UNDERSIDE.
CHECKING THIS AREA MAY RESULT IN DISCOVERY OF CONDITIONS
WHICH COULD CAUSE EXTENSIVE MACHINE DAMAGE.
NOTE: On each item, make sure there are no loose or missing
parts, that they are securely fastened and that no visible
damage exists in addition to any other criteria men-
tioned.
1. Platform and Gate Assembly - Platform mounting pins
secure. Footswitch in good working order; not modi-
fied, disabled or blocked; Bar slides freely.
2. Platform & Ground Control Console - Switches and
levers return to neutral and are properly secured,
decals/placards secure and legible, control marking
legible.
3. Rotator - See Note.
4. Jib - See Note.
5. Jib Rotator - See Note.
6. Boom Sections - See Note.
7. All Hydraulic Cylinders - No visible damage; pivot pins
and hydraulic hoses undamaged, not leaking.
8. Limit Switches - See Note.
Figure 2-3. Daily Walk-Around Inspection - Sheet 2 of 3
Page view 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 117 118

Comments to this Manuals

No comments