Jlg E45A_AJ ANSI Service Manual User Manual

Browse online or download User Manual for Special machinery Jlg E45A_AJ ANSI Service Manual. JLG E45A_AJ ANSI Service Manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 130
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
SERVICE & MAINTENANCE
Models
M45A
M45AJ
E45A
E45AJ
3120765
February 15, 2000
AUSTRALIAN OFFICE
JLG INDUSTRIES, INC.
P.O. Box 5119
11 Bolwarra Road
Port Macquarie, Australia
Telephone: 065 811111
Fax: 065 810122
EUROPEAN OFFICE
JLG INDUSTRIES (EUROPE)
Kilmartin Place,
Tannochside Park
Uddingston, Scotland, G71 5PH
Telephone: 01698 811005
Main Fax: 01698 811055
Parts Fax: 01698 811455
CORPORATE OFFICE
JLG INDUSTRIES, INC.
1 JLG Drive
McConnellsburg, PA.
17233-9533
USA
Telephone: (717) 485-
5161
Fax: (717) 485-6417
Page view 0
1 2 3 4 5 6 ... 129 130

Summary of Contents

Page 1 - SERVICE & MAINTENANCE

SERVICE & MAINTENANCE Models M45A M45AJ E45A E45AJ 3120765 February 15, 2000 AUSTRALIAN OFFICE JLG INDUSTRIES, INC. P.O. Box 5119 11 Bolwarra Ro

Page 2

SECTION 1 - SPECIFICATIONS1-2 – JLG Lift – 3120765Ground Bearing PressureM45A, E45A - 95 psi (6.2 Bar)M45AJ, E45AJ - 110 psi (7.6 Bar)Machine Height (

Page 3 - PRECAUTIONS

SECTION 3 - TROUBLESHOOTING3-4 – JLG Lift – 3120765.Table 3-2.Boom Assembly - TroubleshootingTROUBLE PROBABLE CAUSE REMEDYCONTROL VALVESValve spool st

Page 4 - REVISON LOG

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-5Restricted or broken supply line on valve bank or hydraulic pump.Clean or replace line.Directional

Page 5 -

SECTION 3 - TROUBLESHOOTING3-6 – JLG Lift – 3120765Function Speed and Drive Speed does not operate below horizontal.Damaged wiring on level limit swit

Page 6 - TABLE OF CONTENTS

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-7Boom extends and retracts erratically.Hydraulic system oil low. Replenish oil as necessary.Wear pad

Page 7

SECTION 3 - TROUBLESHOOTING3-8 – JLG Lift – 3120765Boom swings erratically in either direction.Hydraulic system oil low. Replenish oil as necessary.La

Page 8

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-9.Table 3-3.Turntable Assembly - TroubleshootingTROUBLE PROBABLE CAUSE REMEDYCONTROL VALVE.Valve Spo

Page 9 - SECTION 1. SPECIFICATIONS

SECTION 3 - TROUBLESHOOTING3-10 – JLG Lift – 3120765.Table 3-4.Chassis Assembly - TroubleshootingTROUBLE PROBABLE CAUSE REMEDYGENERATOR.Engine will no

Page 10 - 1-2 – JLG Lift – 3120765

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-11FRONT FRAME AXLE AREA.One or both wheels will not steer.Steering link or tie rod broken or attachi

Page 11 - Lubrication Specifications

SECTION 3 - TROUBLESHOOTING3-12 – JLG Lift – 3120765Joystick not functioning properly. Replace joystick/Run System Test.Charger plugged in. Check help

Page 12 - 1-4 – JLG Lift – 3120765

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-13Proportional Flow Valve not functioning properly. Repair or replace valve.Hydraulic pump not funct

Page 13 - 1.12 SERIAL NUMBER LOCATIONS

SECTION 1 - SPECIFICATIONS3120765 – JLG Lift – 1-31.6 TORQUE SPECIFICATIONS1.7 LUBRICATIONHydraulic OilNOTE: Hydraulic oils must have anti-wear qualit

Page 14

SECTION 3 - TROUBLESHOOTING3-14 – JLG Lift – 3120765Brake Drags or runs hot.Low actuation pressure. Place pressure gauge in bleed port & check pre

Page 15

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-15.Table 3-5.Hydraulic System - TroubleshootingTROUBLE PROBABLE CAUSE REMEDYHYDRAULIC SYSTEMS - GENE

Page 16

SECTION 3 - TROUBLESHOOTING3-16 – JLG Lift – 3120765Function sluggish during operation. (System pressure too low.)Main relief valve set too low. Reset

Page 17 - SECTION 2. PROCEDURES

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-17.Table 3-6.Electrical System - TroubleshootingTROUBLE PROBABLE CAUSE REMEDYPLATFORM CONTROLS.No po

Page 18 - 2-2 – JLG Lift – 3120765

SECTION 3 - TROUBLESHOOTING3-18 – JLG Lift – 3120765Hourmeter inoperative.Damaged wiring in hourmeter circuit. Repair or replace wiring.Inoperative ho

Page 19 - 3120765 – JLG Lift – 2-3

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-19This page left blank intentionally.

Page 20 - Optional On Board Generator

SECTION 3 - TROUBLESHOOTING3-20 – JLG Lift – 3120765Figure 3-1. Electrical Components Installation - Sheet 1

Page 21

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-21Figure 3-2. Electrical Components Installation - Sheet 2

Page 22 - 2-6 – JLG Lift – 3120765

SECTION 3 - TROUBLESHOOTING3-22 – JLG Lift – 3120765Figure 3-3. Platform Electrical Schematic - Sheet 1 of 2

Page 23 - 3120765 – JLG Lift – 2-7

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-23Figure 3-4. Platform Electrical Schematic - Sheet 2 of 21870072D

Page 24 - Disassembly

SECTION 1 - SPECIFICATIONS1-4 – JLG Lift – 31207651.8 PRESSURE SETTINGSMain ValveUpper Lift Down Relief - 550 psi (38 bar)Mid/Lower Lift Down Relief -

Page 25 - Cleaning and Inspection

SECTION 3 - TROUBLESHOOTING3-24 – JLG Lift – 31207651870072DFigure 3-5. Turntable Electrical Schematic

Page 26 - Assembly

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-251870072DFigure 3-6. Frame Electrical Schematic

Page 27

SECTION 3 - TROUBLESHOOTING3-26 – JLG Lift – 3120765Figure 3-7. On Board Generator Electrical Schematic1870072D

Page 28

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-27This page left blank intentionally.

Page 29

SECTION 3 - TROUBLESHOOTING3-28 – JLG Lift – 3120765Figure 3-8. Hydraulic Schematic - M45A/E45A - Sheet 1 of 2

Page 30 - 2-14 – JLG Lift – 3120765

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-292792337CFigure 3-9. Hydraulic Schematic - M45A/E45A - Sheet 2 of 2

Page 31

SECTION 3 - TROUBLESHOOTING3-30 – JLG Lift – 31207652792337AFigure 3-10. Hydraulic Schematic - M45AJ/E45AJ - Sheet 1 of 2

Page 32

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-312792337CFigure 3-11. Hydraulic Schematic - M45AJ/E45AJ - Sheet 2 of 2

Page 33 - 2.10 BOOM MAINTENANCE

SECTION 3 - TROUBLESHOOTING3-32 – JLG Lift – 3120765This page left blank intentionally.

Page 35 - Disassembly Boom Sections

SECTION 1 - SPECIFICATIONS3120765 – JLG Lift – 1-51.12 SERIAL NUMBER LOCATIONSFor machine identification, a serial number plate is affixedto the left

Page 36 - Inspection

JLG Worldwide LocationsCorporate OfficeJLG Industries, Inc.1 JLG DriveMcConnellsburg PA. 17233-9533USAPhone: (717) 485-5161Customer Support Toll Free:

Page 37 - 2.11 ROTATOR - HELAC

SECTION 1 - SPECIFICATIONS1-6 – JLG Lift – 3120765Figure 1-2. Torque Chart

Page 38

SECTION 1 - SPECIFICATIONS3120765 – JLG Lift – 1-7Figure 1-3. Lubrication Diagram

Page 39

SECTION 1 - SPECIFICATIONS1-8 – JLG Lift – 3120765Table 1-8. Lubrication ChartComponentsNumber/TypeLube PointsCapacity LubeInterval HoursComments3 Mon

Page 40 - 2.12 BOOM LIMIT SWITCHES

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-1SECTION 2. PROCEDURES2.1 GENERALThis section provides information necessary to performmaintenance on th

Page 41

SECTION 2 - PROCEDURES2-2 – JLG Lift – 3120765Bearings1. When a bearing is removed, cover it to keep out dirtand abrasives. Clean bearings in nonflamm

Page 42 - 2-26 – JLG Lift – 3120765

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-32.3 LUBRICATION INFORMATIONHydraulic System1. The primary enemy of a hydraulic system is contam-ination.

Page 44 - Replacement of Swing Bearing

SECTION 2 - PROCEDURES2-4 – JLG Lift – 31207652.4 BATTERY MAINTENANCE AND CHARGINGBattery Maintenance, Quarterly1. Open battery compartment cover to a

Page 45 - Checking Worm Gear End Play

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-5Figure 2-1. On Board Generator

Page 46 - Adjusting End Play

SECTION 2 - PROCEDURES2-6 – JLG Lift – 3120765NOTE: The engine will automatically shut down under thefollowing conditions:High Engine Oil TemperatureL

Page 47

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-7Holding valves are used in the Lift circuits to preventretraction of the cylinder rod should a hydraulic

Page 48 - 2-32 – JLG Lift – 3120765

SECTION 2 - PROCEDURES2-8 – JLG Lift – 31207652. When working on the platform slave cylinder, strokeplatform slave level cylinder forward until platfo

Page 49

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-9EXTREME CARE SHOULD BE TAKEN WHEN REMOVING THE CYL-INDER ROD, HEAD, AND PISTON. AVOID PULLING THE ROD OF

Page 50 - Bleeding

SECTION 2 - PROCEDURES2-10 – JLG Lift – 31207659. Inspect cylinder head inside diameter for scoring orother damage and for ovality and tapering. Repla

Page 51

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-113. Place a new o-ring and back-up seal in the applica-ble outside diameter groove of the cylinder head.

Page 52 - Adjustment Procedure

SECTION 2 - PROCEDURES2-12 – JLG Lift – 312076511. Assemble the tapered bushing loosely into the pis-ton and insert JLG capscrews (not vendor cap-scre

Page 53

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-1317. Position the cylinder barrel in a suitable holding fix-ture.EXTREME CARE SHOULD BE TAKEN WHEN INSTA

Page 54

INTRODUCTION3120765 – JLG Lift – A-1SECTION A. INTRODUCTION - MAINTENANCE SAFETY PRECAUTIONSA GENERALThis section contains the general safety precaut

Page 55

SECTION 2 - PROCEDURES2-14 – JLG Lift – 31207652.8 CYLINDER REMOVAL AND INSTALLATIONUpper (Main) Boom Lift Cylinder Removal1. Place the machine on a f

Page 56 - 2.22 POSITRAC/TILT MODULE

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-15Mid Boom Lift Cylinder Installation.NOTE: Coat I.D. of bushings with specified lubricant prior toinstal

Page 57 - 3120765 – JLG Lift – 2-41

SECTION 2 - PROCEDURES2-16 – JLG Lift – 3120765Upper Boom Telescope Cylinder Removal1. Place machine on flat and level surface, with UpperBoom in the

Page 58 - Steer Relief

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-172.9 WEAR PADS1. Shim up wear pads until snug to adjacent surface.2. Replace wear pads when worn to thic

Page 59

SECTION 2 - PROCEDURES2-18 – JLG Lift – 3120765Figure 2-21. Platform Components and Attaching Hardware (M45A & E45A)

Page 60

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-19d. Remove hardware securing the lift cylinder pin#1. Using a suitable brass drift and hammer,remove pin

Page 61 - Introduction

SECTION 2 - PROCEDURES2-20 – JLG Lift – 31207657. Using a piece of tape, mark the length of hoses andwires from front of fly boom and bottom of basebo

Page 62 - Using the Analyzer

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-216. Using suitable lifting equipment, slide fly boom sec-tion out to gain access to telescope cylinder a

Page 63

SECTION 2 - PROCEDURES2-22 – JLG Lift – 3120765Figure 2-23. Rotator Assembly (Helac)

Page 64

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-234. Place two (2) 3/8"x16NC bolts in threaded holes inbottom of the actuator. Using a suitable bar,

Page 65 - Machine Setup

INTRODUCTIONA-2 – JLG Lift – 3120765REVISON LOGMay 15, 1999 - Original IssueJuly 1, 1999 - RevisedAugust 1, 1999 - Revised2-40 - Updated 8-30-991-1 an

Page 66 - Machine Personality Settings

SECTION 2 - PROCEDURES2-24 – JLG Lift – 3120765AssemblyNOTE: Lubricate all seals and o-rings with clean hydraulicoil prior to assembly.1. Install new

Page 67

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-25Figure 2-28. Boom Limit Switches

Page 68

SECTION 2 - PROCEDURES2-26 – JLG Lift – 31207652.13 ARTICULATING JIB BOOMRemoval1. For platform/support removal see platform/supportremoval diagram. S

Page 69 - Information

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-27mallet, install pivot pin #2 into fly boom assemblyand secure with mounting hardware.7. Align the slave

Page 70 - Level Vehicle Description

SECTION 2 - PROCEDURES2-28 – JLG Lift – 31207654. If a difference less than 0.057 in. (1.40 mm) is deter-mined, and any of the following conditions ex

Page 71 - Flash Code Description

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-29attach the outer race of the bearing to the frame.Discard the bolts. Use suitable lifting equipmentto r

Page 72

SECTION 2 - PROCEDURES2-30 – JLG Lift – 31207652. If tolerance exceeds .010", reduce end play to lessthan .005". Refer to Adjusting End Play

Page 73

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-31Figure 2-34. Swing Components

Page 74 - 2-58 – JLG Lift – 3120765

SECTION 2 - PROCEDURES2-32 – JLG Lift – 31207652.15 MID AND LOWER LIFT CYLINDER BLEEDING PROCEDURENOTE: Bleeding procedure should only be necessary if

Page 75

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-33Figure 2-35. Drive Hub - Cutaway

Page 76

3120765 – JLG Lift – i TABLE OF CONTENTSTABLE OF CONTENTSSUBJECT - SECTION, PARAGRAPH PAGE NO.SECTION A - INTRODUCTION - MAINTENANCE SA

Page 77

SECTION 2 - PROCEDURES2-34 – JLG Lift – 31207652.18 DRIVE BRAKE - MICODisassembly1. Remove pressure plate (3) from cover (21) byremoving cap screws (1

Page 78

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-35Figure 2-36. Drive Brake - Mico

Page 79

SECTION 2 - PROCEDURES2-36 – JLG Lift – 31207652.19 PINS AND GAR-MAX BEARING REPAIR GUIDELINESFilament wound bearings.1. Pinned joints should be disas

Page 80

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-37Figure 2-37. Speed Sensor Orientation

Page 81 - System Self Test

SECTION 2 - PROCEDURES2-38 – JLG Lift – 3120765Figure 2-38. Frame Mounted Electrical Components

Page 82

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-39Figure 2-39. Steering Components and Spindles

Page 83

SECTION 2 - PROCEDURES2-40 – JLG Lift – 31207652.21 FOOTSWITCH ADJUSTMENTAdjust switch so that functions will operate when pedal isat center of travel

Page 84

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-414. Use Up/Down arrow keys to enter the followingpassword "33271". Depress Enter.5. Use the ri

Page 85

SECTION 2 - PROCEDURES2-42 – JLG Lift – 3120765Platform Level Up Relief1. With pressure gauge at “G” port on main valve, acti-vate and bottom out Plat

Page 86 - 2.25 GENERATOR

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-43Figure 2-43. Brake/Steer Valve Components

Page 87

ii – JLG Lift – 3120765TABLE OF CONTENTS LIST OF FIGURESFIGURE NO. TITLE PAGE NO.1-1. Serial Number Locations. . . . .

Page 88 - Timing Sequences

SECTION 2 - PROCEDURES2-44 – JLG Lift – 3120765Figure 2-44. Main Valve Components

Page 89 - Alarms and Fault Flash Codes

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-452.24 JLG CONTROL SYSTEM ANALYZER KIT INSTRUCTIONSIntroductionWHEN INSTALLING A NEW POWER MODULE CONTROL

Page 90

SECTION 2 - PROCEDURES2-46 – JLG Lift – 3120765The upper lift, swing, and drive are controlled by individualjoysticks, with steering being controlled

Page 91

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-47The top level menus are as follows:HELPDIAGNOSTICSACTIVATE TESTACCESS LEVELPERSONALITIESMACHINE SETUPLE

Page 92 - INSPECTION SCHEDULE

SECTION 2 - PROCEDURES2-48 – JLG Lift – 3120765Once the correct password is displayed, press ENTER.The access level should display the following, if t

Page 93

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-49Machine SetupWhen a machine digit item is selected, press the UP orDOWN arrow keys to adjust its value,

Page 94

SECTION 2 - PROCEDURES2-50 – JLG Lift – 3120765Machine Personality Settings NOTE: Personality settings can be adjusted within theadjustment range in o

Page 95

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-51SWING ACCELeration 0.5 to 5.0s 2.7DECELeration 0.0 to 3.0s 1.8MINimum LEFT speed 0 to 10% 1MAXimum LEFT

Page 96

SECTION 2 - PROCEDURES2-52 – JLG Lift – 3120765JIB ACCELeration 0.5 to 5.0 1.5DECELeration 0.5 to 3.0 0.5MINimum UP speed 0 to 50 9MAXimum UP speed 0

Page 97 - SECTION 3. TROUBLESHOOTING

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-53Machine Configuration Programming InformationNOTE: The following information is to be used when working

Page 98

3120765 – JLG Lift – iii TABLE OF CONTENTSLIST OF FIGURES (continued)FIGURE NO. TITLE PAGE NO.3-1. Electrical Components Installation

Page 99

SECTION 2 - PROCEDURES2-54 – JLG Lift – 31207653= Motion Alarm - Sounds when any function isactive (Option)7. PLATFORM ALARM0= Sounds continuously whe

Page 100 - SECTION 3 - TROUBLESHOOTING

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-55Table 2-8. Help Descriptions and Fault Flash CodesFlash Code DescriptionNo flash code is indicated for

Page 101

SECTION 2 - PROCEDURES2-56 – JLG Lift – 31207652/2Flash code 2/2 indicates problems with drive & steer selection.DRIVE JOYSTICK FAULTYThe drive jo

Page 102

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-572/5Flash code 2/5 indicates that a function is prevented due to a cutout.BOOM PREVENTED - DRIVE SELECTE

Page 103

SECTION 2 - PROCEDURES2-58 – JLG Lift – 31207653/3Flash code 3/3 indicates that a contactor coil is short-circuited.OVERLOADED VALVE SUPPLY-CHECK WIRI

Page 104

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-596/6Flash code 6/6 indicates problems with the CANbus.48V PROTECTION TRIPPED - CHECK INTER-MODULE WIRING

Page 105

SECTION 2 - PROCEDURES2-60 – JLG Lift – 31207659/9Flash code 9/9 indicates problems with the controller.POWER MODULE FAILURE: CONTACTOR DRIVE CODE 1 A

Page 106

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-61Figure 2-46. Analyzer Flow Chart - Sheet 1 of 2

Page 107

SECTION 2 - PROCEDURES2-62 – JLG Lift – 3120765Figure 2-47. Analyzer Flow Chart - Sheet 2 of 2

Page 108

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-63Analyzer Diagnostics Menu Structure In the following structure descriptions, an intended item isselecte

Page 109

iv – JLG Lift – 3120765TABLE OF CONTENTS This Page Left Blank Intentionally.

Page 110

SECTION 2 - PROCEDURES2-64 – JLG Lift – 3120765TILT . . . Displays measured vehicle tilt The first value indicates tilt in die forwards reverse direct

Page 111

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-65System Self TestThe system self test is utilized to locate typical problems.See Table 2-10, System Test

Page 112

SECTION 2 - PROCEDURES2-66 – JLG Lift – 3120765Table 2-11. System Test MessagesRUNNING Initial display when system test is run; certain "critica

Page 113

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-67TESTING VALVES Indicates that the valve test is beginning. Each valve is alternately energized and de-e

Page 114

SECTION 2 - PROCEDURES2-68 – JLG Lift – 3120765CHECKING INPUTS Indicates that the inputs test is beginning. Every input is checked to ensure that it i

Page 115

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-69TEST ALL INPUTS? Prompts whether to check every operator input. If ESC is pressed, the system test end

Page 116

SECTION 2 - PROCEDURES2-70 – JLG Lift – 31207652.25 GENERATORNOTE: Throughout the Generator section, the abbreviationsRBS and CTS are used. RBS stands

Page 117

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-71Figure 2-48. Generator Components

Page 118

SECTION 2 - PROCEDURES2-72 – JLG Lift – 3120765Timing Sequences• RBS Prestart Sequence1. Time Delay Engine Start (TDES)TDES is the period which the RB

Page 119

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-73To Connect the JLG Control System Analyzer to the GeneratorThe JLG Control System Analyzer can be used

Page 120

SECTION 1 - SPECIFICATIONS3120765 – JLG Lift – 1-1SECTION 1. SPECIFICATIONS1.1 CAPACITIESHydraulic Oil Tank5 gallons (19 liters)Generator Fuel Tank4

Page 121

SECTION 2 - PROCEDURES2-74 – JLG Lift – 3120765Figure 2-49. Generator System Analyzer Flow Chart

Page 122

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-75• OverspeedIf the engine speed exceeds the overspeed limit, theengine will stop immediately and an over

Page 123

SECTION 2 - PROCEDURES2-76 – JLG Lift – 31207652.26 PREVENTIVE MAINTENANCE AND INSPECTION SCHEDULEThe preventive maintenance and inspection checks are

Page 124

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-77Table 2-16.Preventive Maintenance and Inspection ScheduleAREADAILY WEEKLYINTERVALMONTHLY 3 MONTH 6 MONT

Page 125

SECTION 2 - PROCEDURES2-78 – JLG Lift – 3120765TURNTABLE1.Engine Oil (see mfg. manual)352.Battery353.Radiator354.Air Cleaner1145.Exhaust System11,56.S

Page 126

SECTION 2 - PROCEDURES3120765 – JLG Lift – 2-79 CHASSIS1.Wheel and Tire Assembly18,9,152.Drive Motors1,5,63.Drive Torque Hubs**1,5,6 34.Drive Brakes1

Page 127

SECTION 2 - PROCEDURES2-80 – JLG Lift – 3120765This page left blank intentionally.

Page 128

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-1SECTION 3. TROUBLESHOOTING3.1 GENERALThis section contains troubleshooting information to beused f

Page 129

SECTION 3 - TROUBLESHOOTING3-2 – JLG Lift – 3120765.Table 3-1.Platform Assembly - TroubleshootingTROUBLE PROBABLE CAUSE REMEDYAutomatic leveling inope

Page 130 - JLG Worldwide Locations

SECTION 3 - TROUBLESHOOTING3120765 – JLG Lift – 3-3Proportional Flow Regulator not powered. Check wiring/Run System Test.Personalities not set correct

Comments to this Manuals

No comments