Jlg 860SJ Operator Manual User Manual Page 71

  • Download
  • Add to my manuals
  • Print
  • Page
    / 158
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 70
SECTION 4 - MACHINE OPERATION
3121138 – JLG Lift – 4-13
4.12 SHUT DOWN AND PARK
To shut down and park the machine, the procedures are as
follows:
1. Drive machine to a reasonably well protected area.
2. Ensure boom is lowered over rear drive axle.
3. Push in the Emergency Stop at Platform Controls.
4. Push in the Emergency Stop at Ground Controls. Posi-
tion Platform/Ground Select switch to center OFF.
5. If necessary, cover Platform Controls to protect instruc-
tion placards, warning decals and operating controls
from hostile environment.
4.13 LIFTING AND TIE DOWN
Lifting
1. Call JLG Industries or weigh the individual unit to find
out the Gross Vehicle Weight.
2. Place the boom in the stowed position with the turntable
locked.
3. Remove all loose items from the machine.
4. Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.
Page view 70
1 2 ... 66 67 68 69 70 71 72 73 74 75 76 ... 157 158

Comments to this Manuals

No comments